Marking the border lines of Excavation The Survey Engineer defines the exact location of the building at the site/ plot of the project.
  • Excavation of the Foundation according to the excavation diagram of the Architectural study.


  • Process of improvement of the soil quality In case of loose soil on the level of foundation, a process of improvement of soil quality takes place (A layer of gravel (3Α) is laid on the exaction level)




Type/ quality of Soil

Earthy, semi-rocky, rocky land Excavation cost.

The cost of the excavation depends on the type of soil (earthy, semi-rocky, rocky land) and on the size of the project (square meters) In particular, the cost is defined as:
  • Fixed amount, for a small-scale project


  • Variable cost per cubic meter of excavation, for a large-scale project



It is noted that the type of soil cannot be determined unless the excavation works begin. However, the type of soil can be roughly estimated by adjacent excavations.